Truck 1 Update - March 25, 2017
Email Print PDF RSS Facebook Google+ Twitter

By CFD Web Administrator
March 25, 2017

Attached are construction and progress photos as of 3/24/17 for the new Truck 1. Construction of the truck is nearly complete at Pierce Manufacturing in Appleton (WI) with a final completion date by the week of April 16th. The aerial ladder for the truck is in the process of being assembled during the upcoming week and should be mated to the vehicle during the next 7-10 days. The truck will then undergo final finish work and aerial ladder testing before being inspected by CFD Truck Committee Members.

Reflective striping was added to the truck during the past week.
Reflective striping was added to the truck during the past week.
Reflective striping was added to the truck during the past week.
Reflective striping was added to the truck during the past week.
 
Reflective striping was added to the truck during the past week.
Reflective striping was added to the truck during the past week.
Reflective striping was added to the truck during the past week.
Reflective striping was added to the truck during the past week.
 
The rear wall of the crew cab interior now has a metal peg board installed, which will help mount equipment inside the cab.
The rear wall of the crew cab interior now has a metal peg board installed, which will help mount equipment inside the cab.
The aerial ladder was delivered from Kewaunee Fabrications in Kewaunee (WI) to Pierce's Aerial Assembly building in Appleton (WI).
The aerial ladder was delivered from Kewaunee Fabrications in Kewaunee (WI) to Pierce's Aerial Assembly building in Appleton (WI).
 
Once the aerial ladder has been fully assembled, it will be mated onto the chassis and body of our truck and begin aerial ladder testing.
Once the aerial ladder has been fully assembled, it will be mated onto the chassis and body of our truck and begin aerial ladder testing.
 

Comment Comment 0 Comment(s)




2017 Incidents
Jan 55
Feb 68
Mar 76
Apr 56
May 58
Jun 66
Jul 55
Aug
Sep
Oct
Nov
Dec
Total 434

Incident Totals
2016 795
2015 755
2014 699
2013 752
2012 759
2011 1131
2010 658
2009 826
2008 850
2007 996
2006 863
2005 818


Web Counters
Website Visitors
Since
March 17, 2010
517,187
Visitors Today
Aug 20, 2017
226
Website Designed and Hosted By: Content Proudly Maintained By: Contact Info:
Firehouse Solutions
www.FirehouseSolutions.com
The Cheshire Fire Department
250 Maple Avenue
Cheshire, Connecticut 06410
Emergency Dial 911
Non-Emergency: 203-272-1828
Station Fax: 203-272-7314
E-mail: Info@cheshirefd.org
Copyright © 2017 Firehouse Solutions (A Service of Technology Reflections, Inc.)